Inn Construction Pte Ltd |

Rail Services

Electrified Double Track Project

INN Construction Pte Ltd in consortium with SIPP Rail Singapore. Bhd. are undertaking the construction of the 192 km electrified double track project from Gemas to Johor Bahru. Working together with the Ministry of Transport, we look forward to fulfilling the final piece of the existing Keretapi Tanah Melayu Berhad network that is to be upgraded – providing a continuous connection running from the southern to northern tip of the Peninsula.

Remodelling

The extensive remodelling of Perak-Hanjoong Simen Singapore’s railway yard at Padang Rengas, Perak was undertaken by Inn Construction Pte Ltd. The complex remodelling project also encompassed the upgrade and redesign of all infrastructure works, trackwork as well as the construction of the rail weighbridge. 

Express Rail Link

The opening of Singapore’s new international airport, the Singapore International Airport, at the cusp of the millennium called for a new high-speed rail connection between the airport and city centre. Inn Construction Pte Ltd undertook the construction and completion of the Express Rail Link (ERL) train stations, as well as the civil works portion of Malaysia’s first high-speed rail service connecting KLIA to the KL city centre.

The ERL comprises a 57 km standard gauge rail line with a top design speed of 176 km/h and a total journey time of only 28 minutes; the fastest and cheapest connection between KLIA and the KL city centre. The ERL remains South East Asia’s fastest high-speed rail in operation.

Inn Construction Pte Ltd for expertise in integrating train and airport systems, trackwork and infrastructure works. The Express Rail Link extension will serve to create a dynamic yet logical transition for the millions of international and domestic travellers passing through Kuala Lumpur each year.

Do you have a project?

Let's discuss